Sunday, 4/9/2006

Two Finished Objects!  Two!

Knitting | Miscellaneous Musing | Sockapaloooza by Judy @ 2:38 pm PDT
Fair Isle Fingerless Gloves for #1 Son

Sharp-eyed readers will note that there are two items crossed off the things to do list! I don’t recall ever finishing two things in one day before. It was a very good day!

First up are the replacement Fair Isle fingerless gloves for #1 Son.

I finished the last finger in the morning and then wove the ends in while waiting for my oil to be changed. There was another woman in the waiting area also knitting. I think she was working on a pair of socks, but since she was very heads-down with her pattern I didn’t want to intrude.

Sockapalooza Sock Pal Socks

Next we have the Beehive Cabled Sockapalooza Socks. I finished these up while watching a little TV on Saturday night. (Don’t I lead an exciting life?)

I just love these socks. The finished product is so soft and cushy. And I love the cables and the heel and the toe and the bind-off. It’s one of those finished objects that I look at and have a hard time believing that it actually came off my needles.

If my sock pal doesn’t like them, I will take them back in a heartbeat!

The particulars about both projects can be found on their own permanent project pages. You can get there via the link in the right side-bar, the FO-2006 gallery, or by clicking on the links in this post.



  • Translate
  • Thought of the Minute
    • They that can give up essential liberty to obtain a little temporary safety deserve neither safety nor liberty.

      (Benjamin Franklin)
  • Word Of The Day
  • Current Weather
    • Portland, OR
    • weather image
    • Temperature: 50F/10C
    • Forecast: Cloudy
    • Current Time: 1:18 PM
    • Sunrise: 7:18 AM
    • Sunset: 4:36 PM
    • Visibility: 10.0mi
    • Wind: 13mph
    • Humidity: 89
    • Dewpoint: 47
    • High: 51F/10C
    • Low: 38F/3C
  • Current Moon
    • Third Quarter/wp-content/plugins/mondphasen/img/m23.png
      11-20-2008

      Third Quarter
      75% of cycle finished


      Next New Moon: 11-27-2008
      Next Full Moon: 12-12-2008
  • I Feel
    • laughing
      pretty
  • Read A Banned Book
  • Stuff I Recommend
  • Some of the things I yammer about
  • (steal these buttons)
    PI button

    401(k)nit

    Yarn Collector

    Yarn Collectors
  • Buttons
    • PDX Knit Bloggers ring

    • Ravelry
    • world wide knit in public day
    • Rockin Girl Blogger
    • KnitNotWar 1,0o0
    • Sockapaloooza 4
    • Rockin Sock Club
    • Ravelry
    • The Proselytize Knitting Badge The MacGyver Badge (Level One) The I Will Crush You With My Math Prowess Badge The I have Been Published in a Knitting Magazine badge
  • Miscellany

    • CaRP

    • WP Forged

    • freshly Minted
  • Locations of visitors to this page



Stuff I Gotta Do

Christmas is coming in 1 month, 4 days, 9 hours, 43 minutes.

Double-Knit Moebius
(aka Klein bottle)

100%

done!

Snake River Socks #2

30%

on the feet

I Mog Di

15%

feet

Peacock Feather Shawl

0%

swatched

Honeybee Stole

5%

in progress

Irtfa'a Faroese Shawl

0%

In the queue

Lenore

20%

On Hold
temporarily abandoned

Fatigues henley sweater

10%

On Hold
temporarily abandoned

Jade Sapphire Scarf

15%

On Hold
no reason - just on hold

#1 Son's Blanket

1%

On Hold
(but still feeling slightly guilty)

Cotton Bag

0%

In the queue
Swatched, finished object is in my head