Tuesday, 10/10/2006

Mailbag and Progress

Knitting by Judy @ 8:45 AM
start of #1 Son’s blanket

See? I haven’t knit so very far on #1 Son’s blanket. Just a short way. Just enough for a little bit of a sock breather. This is Karabella Aurora 8 Space Dyed in colorway 18. Pretty stuff, isn’t it? I love how this knits up, too — very soft and springy. Sorry for the flash pic. There’s no light yet today.

I tell you, after all of the socks I’ve been knitting this year, US#9 needles feel like broomsticks.

I have made some progress on Socktober Socks #1. Another inch or so. It comes by slow degrees. I don’t know that I’m ever going to love these socks. But what matters is that the recipient does.

Alice had asked awhile ago if #1 Son likes his socks. He does indeed, and I am happy to report that they fit perfectly! I bow down to the long, long ago knitster who invented ribbing. It just cures a myriad of ills, doesn’t it? I’m hoping the socks will keep his feet warm on tour - he leaves next Friday and won’t be back until just before Thanksgiving. This tour is with what I think of as his other band - i.e the one he joined second. If you’re interested in the tour dates, this page has a map (loads really slow in IE, but OK in Firefox). For some reason the outbound trip is to the south, and they are coming home across the north. I would have planned that the other way. But what do I know?

~Kristie likes #1 Son’s socks (thanks!) and asks:

I’m interested to know how you go about changing a pattern from cuff down to toe-up.

Well… sometimes I don’t. I have my own tried-and-true toe-up pattern that I call my sock non-pattern, and which I knit using a variety of toes and heels and stitch patterns. But, assuming that I wanted to deconstruct a cuff down sock, I would start with the stitch pattern and see if it can be worked backwards (some can) or must be worked as written. Ribbing, cables, and wavy stitches like feather and fan can often be worked in either direction. Lace can only be worked in one direction.

If I’m not sure if the stitch can be worked both directions, I might swatch it both ways. To work it “backwards,” I start with the last row in the pattern and work to the first row.

I will often just look to see if I can impose the stitch pattern (backwards or forwards) over my own sock. If that looks like it would work, I might not go any further. I would just choose a toe and a heel and go for it.

If the cuff-down pattern has some tricky construction (read that: I want to figure out how they did that), or looks a lot different from my standard sock, I start reading the pattern backwards, just like with the stitch pattern. I start first with the toe construction — does it have a wedge toe? Or a star toe? Does it decrease every other row or every row? Sometimes the toe can’t be worked backwards, so then I substitute a toe from my own bag of tricks. I do the same thing with the heel.

One thing I have to be careful with: I have narrow feet. Many commercial patterns will be too wide as knit. I usually have to adjust for a better fit. Sometimes I’m so taken with a stitch pattern that I let the size of its repeat dictate the width of my socks. The results are usually not as good as when I let the size of the foot dictate the size of the sock. :roll:

Sharon Hurlbut reports that the cow I saw wandering around The Streets Of Tanasbourne was none other than Maggie Moo. Whodda thunk it?



  • Translate
  • Thought of the Minute
    • Whatever people in general do not understand, they are always prepared to
      dislike; the incomprehensible is always the obnoxious.

      (Letitia E. Landon)
  • Word Of The Day
  • Current Weather
    • Portland, OR
    • weather image
    • Temperature: 48F/8C
    • Forecast: Mostly Cloudy
    • Current Time: 7:51 AM
    • Sunrise: 7:50 AM
    • Sunset: 4:46 PM
    • Visibility: 10.0mi
    • Wind: 10mph
    • Humidity: 87
    • Dewpoint: 45
    • High: 48F/8C
    • Low: 34F/1C
  • Current Moon
    • Waxing Gibbous/wp-content/plugins/mondphasen/img/m13.png
      01-08-2009

      Waxing Gibbous
      41% of cycle finished


      Next Full Moon: 01-11-2009
      Next New Moon: 01-25-2009
  • I Feel
    • laughing
      pretty
  • Read A Banned Book
  • Stuff I Recommend
  • Some of the things I yammer about
  • Steal My Buttons (link back please)
    • PI button

    • 401(k)nit

    • Yarn Collector

  • Check This Out
    • Sock Summit 2009
    • PDX Knit Bloggers ring

    • Ravelry
    • world wide knit in public day
    • Rockin Girl Blogger
    • Ravelry
    • The Proselytize Knitting Badge The MacGyver Badge (Level One) The I Will Crush You With My Math Prowess Badge The I have Been Published in a Knitting Magazine badge
  • Miscellany

    • CaRP

    • WP Forged

    • freshly Minted
  • Locations of visitors to this page


Stuff I Gotta Do

Christmas is coming in 11 months, 16 days, 16 hours, 11 minutes Pacific Time (USA).

Snake River Socks #2

30%

on the feet

I Mog Di

15%

on the feet

Peacock Feather Shawl

0%

swatched

Honeybee Stole

5%

in progress

Irtfa'a Faroese Shawl

0%

In the queue

Lenore

20%

On Hold
temporarily abandoned

Fatigues henley sweater

10%

On Hold
temporarily abandoned

Jade Sapphire Scarf

15%

On Hold
no reason - just on hold

#1 Son's Blanket

2%

On Hold
(but still feeling slightly guilty)

Cotton Bag

1%

In the queue
Swatched, finished object is in my head